LF-BJMB
Steel frame complete at Summers Quay

Steel frame complete at Summers Quay

The final beam of the steel structure at Summers Quay, an £8m build-to-rent scheme featuring 67 apartments in Stalybridge, has been lifted into place.

Jonathan Reynolds, MP for Stalybridge & Hyde, was invited to take part in a steel-signing ceremony at the scheme, the first private rented development to be undertaken by housing provider New Charter Group's commercial arm Cavendish Property Developments.
Located at Armentieres Square in the centre of Stalybridge, Summers Quay comprises 22 one bedroom and 45 two-bedroom apartments and 2,600 sq ft of commercial and retail space. Taylor & Wood are appointed as agent for the apartments.
The scheme started on site in August 2016 with completion planned for spring 2018. Rowlinson Construction is the scheme's contractor and Pozzoni its architect.
Steel frame complete at Summers Quay

Speaking at the ceremony, Reynolds said: "The central location of this development makes it crucial to the continued regeneration of our brilliant, vibrant town. Stalybridge dearly needs a mix of new housing. These apartments will be quality, private rented accommodation delivered via a respected and responsible landlord."

Tony Powell, deputy chief executive at New Charter Group added: "We're creating a statement building here in Stalybridge and contributing to what is a relatively new market for luxury private rental accommodation."

The site formerly housed the Millpond pub, which closed in 2014, and the Casablanca health club, which was badly damaged by fire in 2005.

Related News
  • Aluminium Composite Panel Instruction

    Aluminium Composite Panel Instruction

    November 20, 2017LF aluminium composite panel adopt 3000,5000 series of south-west alulminium as raw materials, specially plastic core materials from Qilu Petrochemical. Polymer film of USA DUPONP and USA PPG paint wi...view
  • Stainless Steel Space Structure

    Stainless Steel Space Structure

    November 23, 2017Space Structure is a three dimensional structure which caters to the need of column free spatial area. Space structures are used for supporting the building structure while improving the outlook.Stain...view
  • The Longest Railroad Tunnel in The World

    The Longest Railroad Tunnel in The World

    November 23, 2017Clad in an orange hardhat and a bright green vest with light-reflecting stripes, I'm standing by the shiny new tracks of the Gotthard Base Tunnel in Switzerland — the longest railroad tunnel in the w...view
  • More Industrial Overcapacity To Be Cut For High-Quality Economy In 2018

    More Industrial Overcapacity To Be Cut For High-Quality Economy In 2018

    January 12, 2018More industrial overcapacity will be cut to deepen supply-side reform for high-quality economic develop in 2018, People's Daily reports.China is expected to fulfill the goal proposed in 2016 to shut d...view
  • China's Producer Price Up 1.5% in November

    China's Producer Price Up 1.5% in November

    November 20, 2017BEIJING - China's producer price index (PPI), which measures costs for goods at the factory gate, beat market expectations to reach a five-year high in November, official data showed Friday.The readin...view
  • World's longest dust screen group being built in China

    World's longest dust screen group being built in China

    November 23, 2017A dust screen measuring 23-meters in height and 2,900-meters in length is being built at Qinhuangdao Port in North China's Hebei province on Dec 27, 2016. The dust screen will connect with the 5,000-m...view
  • TEL:+86 516 8595 0258
  • FAX:+86 516 8595 0278
  • EMAIL:marketing01@cnxzlf.com
  • ADDRESS:222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China