LF-BJMB
Construction Kick-off meeting of HAND OF GOD Cathedral Roof project

Construction Kick-off meeting of HAND OF GOD Cathedral Roof project

\

Construction kick-off meeting for the HAND OF GOD cathedral roof project were held in Harcourt on June 8, 2019.Pastor David and OPMT members as well as LF construction team and site construction personnel attended the commencement ceremony of the project.

At the meeting, the leaders of OPMT introduced the whole process of the project and their expectations for the project, and especially introduced the LF construction team. They hoped that all departments of the project could work closely with the LF construction team to complete the project smoothly.

Pastor David gave the LF construction team great appreciation and expectation, and took pictures with them to encourage them to work together to complete the project with high quality and high speed.

Under the public gaze, the crane lifted the starting net frame to the exact position, which marked the smooth start of the project.

Related News
  • Covered Shed

    Covered Shed

    November 21, 2017LONGITUDINAL COVERED SHED:In this case, coal stockpile will be formed by the conventional rail mounted stacker cum reclaimer. The entire stockpiles and the Stacker cum Reclaimer machines will be cover...view
  • Braced Domes

    Braced Domes

    August 28, 2018Domes are one of the oldest and well-established structural forms and have been used in architecture since the earliest times. They are of special interest to engineers as they enclose a maximum amoun...view
  • Baogang Group To Produce Automobile Steel Sheets

    Baogang Group To Produce Automobile Steel Sheets

    November 20, 2017A worker inspects the production line at a rare earth automobile steel sheet production plant, Baotou, Inner Mongolia autonomous region, Jan 15. When the plant is fully operational, it is expected to ...view
  • Terminal 3 of Beijing Capital International Airport

    Terminal 3 of Beijing Capital International Airport

    November 21, 2018There are 18 study models on show, illustrating the thinking process of another critical feature of Reichstag's design, the huge glass dome erected on the curve roof."The symbol of the unified Germany...view
  • Top 5 Reasons to Choose Steel Storage Sheds and Other Metal Buildings

    Top 5 Reasons to Choose Steel Storage Sheds and Other Metal Buildings

    November 23, 2017There are a wide variety of materials used to manufacture outdoor sheds, including steel, aluminum, wood, and even plastic. So which one is best? They all have their good points, but we think that st...view
  • Drax Coal Closures Possible Ahead of Schedule

    Drax Coal Closures Possible Ahead of Schedule

    May 10, 2018UK power generator Drax may be able to end its coal-fired power operations ahead of the government's 2025 deadline.The company's CEO believes Drax's biomass and gas-fired power operations, coupled wit...view
  • TEL:+86 516 8595 0258
  • FAX:+86 516 8595 0278
  • Email:marketing01@cnxzlf.com
  • ADDRESS:222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China

[QUERYS RESOURCE ID #57]

Total quantity:881, Total process time:0.21109080 ms

[FILES LOADED]

Total quantity:22

Use Memory: 11.9MB

Time-consuming: 0.36289 ms