LF-BJMB
Steel frame complete at Summers Quay

Steel frame complete at Summers Quay

The final beam of the steel structure at Summers Quay, an £8m build-to-rent scheme featuring 67 apartments in Stalybridge, has been lifted into place.

Jonathan Reynolds, MP for Stalybridge & Hyde, was invited to take part in a steel-signing ceremony at the scheme, the first private rented development to be undertaken by housing provider New Charter Group's commercial arm Cavendish Property Developments.
Located at Armentieres Square in the centre of Stalybridge, Summers Quay comprises 22 one bedroom and 45 two-bedroom apartments and 2,600 sq ft of commercial and retail space. Taylor & Wood are appointed as agent for the apartments.
The scheme started on site in August 2016 with completion planned for spring 2018. Rowlinson Construction is the scheme's contractor and Pozzoni its architect.
Steel frame complete at Summers Quay

Speaking at the ceremony, Reynolds said: "The central location of this development makes it crucial to the continued regeneration of our brilliant, vibrant town. Stalybridge dearly needs a mix of new housing. These apartments will be quality, private rented accommodation delivered via a respected and responsible landlord."

Tony Powell, deputy chief executive at New Charter Group added: "We're creating a statement building here in Stalybridge and contributing to what is a relatively new market for luxury private rental accommodation."

The site formerly housed the Millpond pub, which closed in 2014, and the Casablanca health club, which was badly damaged by fire in 2005.

Related News
  • Spatial Structure

    Spatial Structure

    November 23, 2017A spatial structures refers to a spatial structure whose members are connected rigidly to each other so that they transfer moment and shear in addition to axial forces. In comparison, space trusses ar...view
  • Environmentalists Sue Trump Over Coal Pollution Ahead Of State Of The Union

    Environmentalists Sue Trump Over Coal Pollution Ahead Of State Of The Union

    February 2, 2018An environmental group sued the Trump administration for delaying regulations on coal power plant pollution just ahead of the president's State of the Union address Tuesday during which Trump plans to...view
  • Space frame truss

    Space frame truss

    October 19, 2018A space frame truss is a three-dimensional framework of members pinned at their ends. A tetrahedron shape is the simplest space truss, consisting of six members that meet at four joints. Large planar ...view
  • World's longest dust screen group being built in China

    World's longest dust screen group being built in China

    November 23, 2017A dust screen measuring 23-meters in height and 2,900-meters in length is being built at Qinhuangdao Port in North China's Hebei province on Dec 27, 2016. The dust screen will connect with the 5,000-m...view
  • The Advantages of Steel Structure Warehouse

    The Advantages of Steel Structure Warehouse

    November 23, 2017Steel is the ideal construction medium for warehouses and other industrial buildings for a variety of reasons. In addition to being economical and durable, steel also provides the simplest solution fo...view
  • 5 Reasons Why Your Building Needs a Steel Truss Roof

    5 Reasons Why Your Building Needs a Steel Truss Roof

    November 20, 2017What is a steel truss roof, and why do you need one?A steel truss roof is a triangulated system of interconnected elements. Typically trusses were made out of timber or steel, although over time steel...view
  • TEL:+86 516 8595 0258
  • FAX:+86 516 8595 0278
  • Email:marketing01@cnxzlf.com
  • ADDRESS:222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China

[QUERYS RESOURCE ID #57]

Total quantity:873, Total process time:0.22919583 ms

[FILES LOADED]

Total quantity:22

Use Memory: 11.7MB

Time-consuming: 0.39011 ms