LF-BJMB
Completion of the main steel structure of the Shanghai Planetarium

Completion of the main steel structure of the Shanghai Planetarium



At noon on June 12, with the completion of the installation and welding of the truss between the truss, the Shanghai Planetarium (Shanghai Science and Technology Museum Branch) was unloaded with a large cantilever structure with a steel volume of more than 2,000 tons.This marked the successful conclusion of all the main steel structure projects of the Shanghai Planetarium, and the construction of the main structure achieved a staged victory.


The Shanghai Planetarium, built in Shanghai Lingang New City, is the largest planetarium in the world, and is expected to be completed by the end of 2020. Its construction project has a total land area of 58,602 square meters and a construction area of 38,164 square meters, of which the above-ground construction area is 25,762 square meters and the underground construction area is 12,402 square meters,including the underground 1st floor and 3 floors of the main building, as well as the adolescent observation base, the Volkswagen Observatory, the Magic Sun Tower and other ancillary buildings. It is planned to build the world's largest and world-class planetarium.

The three major exhibition areas interpret "people and the universe"
At the site of the Shanghai Planetarium site, you can see that its main building is shaped like three interstellar orbits, meaning that the spherical buildings of the earth, the moon and the sun "run". The unique design of the "round hole skylight" and "balloon aura" on the main building makes the building itself like an astronomical "instrument".

Related News
  • ASTM

    ASTM

    November 20, 2017ASTM International is an international standards organization that develops and publishes voluntary consensus technical standards for a wide range of materials, products, systems, and services. Some 1...view
  • Congratulation! Nigeria Church Dome Roof Skylight Project Begins Construction

    Congratulation! Nigeria Church Dome Roof Skylight Project Begins Construction

    November 20, 2017The projected area of church dome roof skylight project is about 600㎡, the main structure is light steel structure with section aluminum, and the roofing is hollow laminated tempered glass. The proje...view
  • Braced Domes

    Braced Domes

    August 28, 2018Domes are one of the oldest and well-established structural forms and have been used in architecture since the earliest times. They are of special interest to engineers as they enclose a maximum amoun...view
  • ADVANTAGES OF STRUCTURAL STEEL FRAME CONSTRUCTION

    ADVANTAGES OF STRUCTURAL STEEL FRAME CONSTRUCTION

    May 21, 2019Structural steel isn't just for skyscrapers, large agriculture buildings and garages. There are multiple reasons why steel makes an attractive building option from start to finish, not the least of wh...view
  • Vertical Forest Building to Help Solve Air Problem in China

    Vertical Forest Building to Help Solve Air Problem in China

    November 23, 2017Nanjing of East China's Jiangsu province will become the third city in the world where Italian architect Stefano Boeri will build Vertical Forest buildings, which could possibly improve the city's air...view
  • The Advantages of Steel Structure Warehouse

    The Advantages of Steel Structure Warehouse

    November 23, 2017Steel is the ideal construction medium for warehouses and other industrial buildings for a variety of reasons. In addition to being economical and durable, steel also provides the simplest solution fo...view
  • TEL:+86 516 8595 0258
  • FAX:+86 516 8595 0278
  • Email:marketing01@cnxzlf.com
  • ADDRESS:222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China

[QUERYS RESOURCE ID #57]

Total quantity:923, Total process time:0.26167083 ms

[FILES LOADED]

Total quantity:22

Use Memory: 12.2MB

Time-consuming: 0.44516 ms