It was reported in June 2009, in Kuala Terrengganu, Malaysia, that the roof of a RM300 mil (US $90 mil) Sports Stadium collapses suddenly just after it was recently completed.

No one was injured, the damage was extensive, as practically the whole east wing came crush down at 8am in the morning, a few cars were damaged. The contractor was a South Korean Company while the Consultants were local Malaysians. The Repairs were carried and costs about RM35mil (US$10mil).

Since the works were still within the defects liability period which is usually 12 months or more for such a massive project, the cost of remedial works were borne by the Contractor. What other issues involved would be under the relevant authorities.

An Investigation Committee was immediately set up with involvement from the Public Works Department, Ministry of Works, Related Agencies, Experts, and an extensive report was later compiled.

Some of the photographs of the roof stadium collapse would be revealing:

The Reports by the Investigation Committee highlighted a few factors which could have contributed to the failure of the roof structures as summarized below:


  • The design was inadequate 
  • The roof was not erected properly resulting in misalignment
  • No quality control on Site
  • Materials and Workmanship not in accordance to specifications 
  • Alternative designs from Contractor was adopted without proper analysis


The above sounds too familiar and so common in our construction industry. Almost every site is faced with these issues. In fact, space frame structures are very resilient and would not have been catastrophic in collapse, even if under designed. The concept of limit state design takes account of this, allowing collapse to be progressive rather than catastrophic. Only steel framed structures which are not combined the structural design with installation design are more prone to collapse especially during erection period, and particularly for 3D space frame structures.


Related News
  • Why choose 3D Space Frame Structures?

    Why choose 3D Space Frame Structures?

    April 26, 2018Structural efficiency, rigidity, reduced deflections, integration of services, resilience, ease & speed of manufacturing and installation are some of the biggest advantage of 3D Space Frame Struct...view
  • Bulk storage solutions

    Bulk storage solutions

    April 29, 2019LF builds bulk storage solutions for ring stockpiles, conical piles, longitudinal piles, and free-form material piles.Proven SystemGeodesic domes are made with an efficient structural system of strong...view
  • Bayterek – the Tree of Life in the center of Eurasia

    Bayterek – the Tree of Life in the center of Eurasia

    November 20, 2017Bayterek is the capital's symbol and business card. Bayterek tower sits in the very middle of the capital's new administrative center . Everything in this monument is symbolic: the golden sun on the t...view
  • Reichstag Dome

    Reichstag Dome

    November 23, 2017The Reichstag dome is a large glass dome with a 360 degree view of the surrounding Berlin cityscape. The debating chamber of the Bundestag, the German parliament, can be seen down below. A mirrored co...view
  • Glass Igloos

    Glass Igloos

    November 21, 2017The first drafts and sketches of the Glass Igloos were outlined already on year 1993 by Architect Esko Lehmola, but suitable manufacturer and related machinery was not found. The next drafts on year 2...view
  • Poland Concludes Bidding Process For New Coal-Fired Plant

    Poland Concludes Bidding Process For New Coal-Fired Plant

    January 4, 2018Plans to build a new 1 GW coal-fired power plant in Poland are moving ahead, with the bidding process for its construction completed this week.National utility Energa, which is developing the project ...view
  • TEL:+86 516 8595 0258
  • FAX:+86 516 8595 0278
  • Email:marketing01@cnxzlf.com
  • ADDRESS:222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China

[QUERYS RESOURCE ID #57]

Total quantity:884, Total process time:0.25207949 ms

[FILES LOADED]

Total quantity:22

Use Memory: 12.2MB

Time-consuming: 0.41911 ms