It was reported in June 2009, in Kuala Terrengganu, Malaysia, that the roof of a RM300 mil (US $90 mil) Sports Stadium collapses suddenly just after it was recently completed.

No one was injured, the damage was extensive, as practically the whole east wing came crush down at 8am in the morning, a few cars were damaged. The contractor was a South Korean Company while the Consultants were local Malaysians. The Repairs were carried and costs about RM35mil (US$10mil).

Since the works were still within the defects liability period which is usually 12 months or more for such a massive project, the cost of remedial works were borne by the Contractor. What other issues involved would be under the relevant authorities.

An Investigation Committee was immediately set up with involvement from the Public Works Department, Ministry of Works, Related Agencies, Experts, and an extensive report was later compiled.

Some of the photographs of the roof stadium collapse would be revealing:

The Reports by the Investigation Committee highlighted a few factors which could have contributed to the failure of the roof structures as summarized below:


  • The design was inadequate 
  • The roof was not erected properly resulting in misalignment
  • No quality control on Site
  • Materials and Workmanship not in accordance to specifications 
  • Alternative designs from Contractor was adopted without proper analysis


The above sounds too familiar and so common in our construction industry. Almost every site is faced with these issues. In fact, space frame structures are very resilient and would not have been catastrophic in collapse, even if under designed. The concept of limit state design takes account of this, allowing collapse to be progressive rather than catastrophic. Only steel framed structures which are not combined the structural design with installation design are more prone to collapse especially during erection period, and particularly for 3D space frame structures.


Related News
  • What is the key to coal storage?

    What is the key to coal storage?

    November 23, 2017The necessary measures to ensure proper maintenance of operation's coal stockpile is crucial to running an efficient, environmentally-friendly coal plant. Stored improperly, the value of coal pile can...view
  • Exploring Snow Sculpting In Jilin

    Exploring Snow Sculpting In Jilin

    November 21, 2017Snow sculptures at Jingyuetan in Changchun, Jilin province, an experiential snow sculpture park and the venue for an international skiing festival called Vasaloppet, have been taking shape.During the ...view
  • Shenzhen Civic Center Pengcheng spread its wings to build a miracle

    Shenzhen Civic Center Pengcheng spread its wings to build a miracle

    November 2, 2018It is understood that the Shenzhen Civic Center is one of the largest municipal buildings in Shenzhen and one of the landmark buildings with a total construction area of 210,000 square meters. The mos...view
  • Dome Modular Roof

    Dome Modular Roof

    November 21, 2017Dome modular roof are high quality, durable polycarbonate thermoformed roof , designed to make optimum use of natural light.Dome roof are available in an extensive range of over 40 sizes, and a range ...view
  • Long-span buildings

    Long-span buildings

    August 25, 2018Long-span buildings create unobstructed, column-free spaces greater than 30 metres (100 feet) for a variety of functions. These include activities where visibility is important for large audiences (au...view
  • Long Span for Long Piles

    Long Span for Long Piles

    November 6, 2018If mines, ports, power and cement plants around the world have one thing in common, it's the need to have enormous stockpiles of dry bulk material. And, managing these stockpiles for greater sustainab...view
  • TEL:+86 516 8595 0258
  • FAX:+86 516 8595 0278
  • Email:marketing01@cnxzlf.com
  • ADDRESS:222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China

[QUERYS RESOURCE ID #57]

Total quantity:776, Total process time:0.23941231 ms

[FILES LOADED]

Total quantity:22

Use Memory: 11.6MB

Time-consuming: 0.41817 ms