How to ensure the accuracy of pre-settlement of space frame engineering

2021-11-12

    Share to:

space frame engineering

How to ensure the accuracy of the pre-settlement of the space frame project. The accuracy of the pre-settlement of the space frame project plays an important role in the reasonable determination of the project cost, the control of the project cost, and the improvement of the economic efficiency of the enterprise. A good budget before the start of the project is an important step In this way, we can do what we can and avoid blind construction, but how can we achieve the accuracy of estimation? The following are worthy of your attention. Because of its own advantages, steel structures are widely used in modern buildings such as bridges, industrial plants, and high-rise buildings.

To ensure the accuracy of the pre-settlement of the space frame processing project, first of all, the construction drawing budget is very important. It can provide a reference basis for the project completion settlement and reduce the later workload of the pre-settlement. Then you can understand the first-hand information of the space frame processing engineering by going deep into the construction site, so that you can understand the construction conditions, construction methods, construction machinery, and related design changes at the grid processing site in more detail. The next step is to collect relevant data and do a good job in data accumulation. Only by continuously collecting, accumulating and updating can we do the pre-settlement work faster and more accurately. The calculation of all costs during the period includes processing fees, which include auxiliary materials, power consumption, wages and wage surcharges, and management costs. When the processing procedure requires outsourcing, the processing cost of this procedure is settled according to the actual situation, and the shortfall fee is added according to the processing weight. The next step is to collect relevant data and do a good job in data accumulation. Only by continuously collecting, accumulating and updating can we do the pre-settlement work faster and more accurately.

The calculation of all costs during the period includes processing fees, which include auxiliary materials, power consumption, wages and wage surcharges, and management costs. When the processing procedure requires outsourcing, the processing cost of this procedure is settled according to the actual situation, and the shortfall fee is added according to the processing weight.